Susquehanna 1 - Status & History

Comprehensive reactor performance metrics, cycle analysis, and historical outage data.

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri), the current state, and what is coming: the utility's published Scheduled outage plus, for subscribers, NukeWorker's model Projection. Colored by status. How far ahead you can see depends on your plan.
Aug2025SepOctNovDecJan2026FebMarAprMayJunJulAugOnline: Jul 14, 2025 to Jul 22, 2025Scram: Jul 23, 2025 to Jul 24, 2025Reduced Power: Jul 25, 2025 to Jul 26, 2025Online: Jul 27, 2025 to Jul 31, 2025Power Ascension: Aug 1, 2025 to Aug 4, 2025Online: Aug 5, 2025 to Aug 7, 2025Power Ascension: Aug 8, 2025 to Aug 14, 2025Online: Aug 15, 2025 to Nov 12, 2025Forced Outage: Nov 13, 2025 to Nov 16, 2025Reduced Power: Nov 17, 2025 to Nov 19, 2025Power Ascension: Nov 20, 2025Online: Nov 21, 2025 to Dec 10, 2025Reduced Power: Dec 11, 2025Online: Dec 12, 2025 to Jan 15, 2026Reduced Power: Jan 16, 2026Online: Jan 17, 2026 to Feb 4, 2026Coastdown: Feb 5, 2026 to Feb 6, 2026Online: Feb 7, 2026 to Feb 13, 2026Coastdown: Feb 14, 2026 to Mar 22, 2026Refueling Outage: Mar 23, 2026 to May 4, 2026Power Ascension: May 5, 2026 to May 21, 2026Online: May 22, 2026 to May 24, 2026Reduced Power: May 25, 2026Online: May 26, 2026 to Jul 14, 2026Scram (reactor trip): Jul 22, 2025Today
OnlineReduced PowerCoastdownPower AscensionRefueling OutageForced OutageScramScram (reactor trip)
?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
28
Excellence
#83 of 93
Bottom Quartile
?
Days of continuous operation since the last outage ended. Clean run (no forced outages since last refueling).
71
Current Run
days ✔
?
Longest recorded period of continuous operation between outages (2008-04-16 to 2010-03-02).
685
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (610 days for this 24-month cycle unit) with no trips to 0% power.
2
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power).
88%
Capacity Factor
?
Net electricity actually generated over the most recent 12 months reported by the U.S. EIA (Form EIA-923), summed across every unit at this plant. Authoritative actuals, not an estimate.
18.55 TWh
Net Generation
EIA-923 · 12 mo to 2026-04 · plant total
?
Total number of scheduled refueling outages detected in the historical data.
14
Outages
since 1999
?
Average time from first power generation (>0%) to sustained full power (≥95% for 2+ days) across the last 3 scheduled outages. Click to compare against the fleet on the Operator Efficiency Leaderboard.
8.3
Avg Startup
days (last 3)
?
Average fuel utilization — percent of the designed fuel cycle that this unit consumes before refueling, derived from the historical burn-down trajectory. Higher = more efficient operator (refuels with less margin remaining; closer to coastdown). Computed as 100% minus the unit's average refuel-point fuel %, using the last 3 years where available, otherwise lifetime average. Click to compare against the fleet on the Operator Efficiency Leaderboard.
96.1%
Fuel Utilization
3yr avg
?
NukeWorker's Operational Excellence Score is a composite 0–100 ranking of every active US nuclear unit across 7 publicly observable performance metrics, grouped into three sub-scores:
Reliability — capacity factor, forced outage days, B2B avg streak
Efficiency — fuel utilization, refuel duration
Discipline — startup duration, scram count
Each unit's metric is converted to a percentile across the active fleet. Sub-score = average of its components; composite = average of the three sub-scores. Use the time-window toggle below to switch between 3yr / 5yr / lifetime.
Time window — change how far back we look
NukeWorker's
Operational
Excellence Score
28/100
Bottom Quartile · #83/93
5-year window

Susquehanna 1 ranks #83 of 93 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: B2B Avg Streak (68th percentile). Weakest: Startup Duration (4th percentile).

Reliability
43
Capacity factor + Forced outages + B2B streaks
Efficiency
34
Fuel utilization + Refuel duration
Discipline
5
Startup duration + Scram count
Cohort Rankings apples-to-apples comparison within each peer group
Reactor type: #25 of 31 BWR
Containment: #8 of 8 Mark II (BWR)
Cycle length: #34 of 40 24-month cycle
Fleet rank above (83 of 93) compares all active US units; cohort ranks compare only against units sharing this property.
Per-dimension breakdown (7 metrics)
Capacity Factor 32th
89.2% (higher better, Reliability)
Forced Outage Days/yr 29th
6.2d (lower better, Reliability)
B2B Avg Streak 68th
675d (higher better, Reliability)
Fuel Utilization 20th
96.0% (higher better, Efficiency)
Refuel Duration 48th
33d (lower better, Efficiency)
Startup Duration 4th
11.2d (lower better, Discipline)
Scrams (5-year) 7th
1.0/yr (lower better, Discipline)

Each dimension's percentile is computed across the active US fleet (93 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →

Methodology

NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.

How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 93 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.

Active window — 5-year:

  • Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
  • Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
  • Discipline — robust mean startup duration, scrams/yr (5yr, annualised)

Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.

What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.

Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.

Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.

Refresh cadence: recomputed daily. Each window cached separately.

A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.

5-yr trend: 2021: 36/100 (#68/93)2022: 37/100 (#65/92)2023: 30/100 (#76/92)2024: 36/100 (#71/93)2025: 34/100 (#73/93)2026: 32/100 (#75/93) Stable vs 2025
Compare Susquehanna 1 head-to-head with up to 3 other units. Compare now
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.

Outage Duration Trend

Susquehanna 1 has 49 outages plotted here, averaging 18 days each. The most recent, in Mar 2026, was a scheduled refueling outage lasting 43 days.
?
Days between consecutive scheduled refueling outage starts, showing operating cycle regularity. The purple dashed line marks the average cycle length. Most U.S. reactors operate on 18-month (547 day) or 24-month (730 day) cycles.

Cycle Length History

Between refueling outages, Susquehanna 1 runs about 731 days, or roughly 24 months, per cycle. That average comes from 13 completed cycles, the most recent lasting 728 days.
?
Time in days from first power generation (>0%) to sustained full power (≥95% for 2+ consecutive days) after each scheduled refueling outage. The dashed line marks the average. Includes startup testing holds and power dips.

Startup Duration Trend

After a refueling outage, Susquehanna 1 takes about 8 days to climb from first power back to full power. That average is drawn from 13 startups on record, and the most recent took 10 days.
?
Estimated fuel remaining in the current cycle, expressed as a percentage of the unit's typical cycle. Starts at 100% when the unit returns to power post-refuel and drops as full-power-days are burned. Days at reduced power burn fuel proportionally — so a unit with significant downtime (high burn deficit) drops slower and ends up with MORE fuel left than its calendar position would suggest. Coastdown threshold around 15%. Toggle to overlay past cycles on a normalized "days into cycle" axis to see how aggressively this unit historically burns down before refuel.

Fuel Burn Down Cycle since May 5, 2026

90.2% remaining 70 / 696 days 2.1 FPD margin
Susquehanna 1 is 70 days into its current fuel cycle with an estimated 90.2% of its fuel left. This cycle is set up to run about 696 days. Across its last 13 cycles, it has refueled with an average of 7.6% remaining.
Avg refuel: 7.6% Avg refuel (3yr): 3.9% Deepest burn: 3.9% (2024-04 → 2026-03) Most margin: 16.3% (2012-06 → 2014-04)
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.

Power History

Over its operating life, Susquehanna 1 has run at about 88% of its rated capacity. Across the last 12 reported months it averaged 83.3%. On the chart, flat stretches near the top are full-power running and drops to zero are outages.
This table logs every recorded outage for Susquehanna 1, 49 in all since 1999. Of those, 14 were scheduled refueling outages and 35 were unplanned or forced. The typical outage lasted about 18 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
Scheduled
2026-03-23 2026-05-04 43 127d 2026-03-23 0d
Unscheduled
2025-11-13 2025-11-16 4 112d - -
Scram # 57822
2025-07-23 2025-07-24 2 314d - -
Unscheduled
2024-09-09 2024-09-12 4 138d - -
Scheduled
2024-03-25 2024-04-24 31 132d 2024-03-24 +1d
Scram # 56846
2023-11-10 2023-11-14 5 534d - -
Scram # 55909
2022-05-24 2022-05-25 2 24d - -
Scheduled
2022-03-28 2022-04-30 34 112d 2022-03-28 0d
Scram # 55616
2021-12-01 2021-12-06 6 128d - -
Scram # 55370
2021-07-22 2021-07-26 5 441d - -
Scram # 54691
2020-05-04 2020-05-07 4 3d - -
Unscheduled
2020-04-29 2020-05-01 3 6d - -
Scheduled
2020-03-28 2020-04-23 27 583d 2020-03-27 +1d
Unscheduled
2018-08-19 2018-08-23 5 110d - -
Scheduled
2018-03-31 2018-05-01 32 295d 2018-04-30 -30d
Scram # 52795
2017-06-09 2017-06-09 1 347d - -
Unscheduled
2016-06-07 2016-06-27 21 36d - -
Unscheduled
2016-04-23 2016-05-02 10 3d - -
Scheduled
2016-03-13 2016-04-20 39 116d 2016-03-13 0d
Scram # 51532
2015-11-13 2015-11-18 6 331d - -
Unscheduled
2014-12-14 2014-12-17 4 193d - -
Scheduled
2014-04-13 2014-06-04 53 306d 2014-04-12 +1d
Unscheduled
2013-06-11 2013-06-11 1 3d - -
Scram # 49099
2013-06-08 2013-06-08 1 2d - -
Scram # 49099
2013-06-05 2013-06-06 2 4d - -
Unscheduled
2013-05-09 2013-06-01 24 184d - -
Unscheduled
2012-10-21 2012-11-06 17 113d - -
Unscheduled
2012-06-20 2012-06-30 11 16d - -
Scheduled
2012-04-01 2012-06-04 65 284d 2012-03-30 +2d
Unscheduled
2011-05-17 2011-06-22 37 69d - -
Unscheduled
2011-03-05 2011-03-09 5 37d - -
Scram # 46569
2011-01-26 2011-01-27 2 176d - -
Unscheduled
2010-07-17 2010-08-03 18 61d - -
Unscheduled
2010-05-15 2010-05-17 3 21d - -
Unscheduled
2010-04-23 2010-04-24 2 7d - -
Scheduled
2010-03-02 2010-04-16 46 685d 2010-03-02 0d
Scheduled
2008-03-04 2008-04-16 44 128d 2008-03-05 -1d
Unscheduled
2007-10-13 2007-10-28 16 319d - -
Unscheduled
2006-11-26 2006-11-28 3 161d - -
Unscheduled
2006-06-15 2006-06-18 4 66d - -
Scheduled
2006-03-04 2006-04-10 38 110d 2006-03-03 +1d
Unscheduled
2005-10-29 2005-11-14 17 555d - -
Unscheduled
2004-04-22 2004-04-22 1 2d - -
Scheduled
2004-02-28 2004-04-20 53 153d 2004-02-27 +1d
Unscheduled
2003-09-24 2003-09-28 5 519d - -
Scheduled
2002-03-02 2002-04-23 53 667d 2002-03-02 0d
Scheduled
2000-03-19 2000-05-04 47 249d 2000-03-19 0d
Unscheduled
1999-07-01 1999-07-14 14 27d - -
Unscheduled
1999-05-30 1999-06-04 6 - - -
Page created in 0.076 seconds with 8 queries.