Susquehanna 1 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Susquehanna 1.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
33
Excellence
#75 of 93
Bottom Quartile
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
69
Current Run
days
#76 of 95
Bottom Quartile
?
Longest recorded period of continuous operation between outages.
716
Record Run
days
#30 of 95
Mid Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (610 days for this 24-month cycle unit) with no trips to 0% power.
2
B2B Runs
#80 of 86
Bottom Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
88%
Capacity Factor
#74 of 95
Bottom Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
18.55 TWh
Net Generation
EIA-923 · 12 mo to 2026-04 · plant total
?
Community rating score (Bayesian-adjusted). Based on 63 votes. Ranked against all rated facilities.
66.9
Rating
63 votes
#4 of 97
Top Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
10
Scrams
#74 of 94
Bottom Quartile
?
Years since commercial operation began. License remaining: 16 years.
43.1
Operating Age
years
16 yrs remaining

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri), the current state, and what is coming: the utility's published Scheduled outage plus, for subscribers, NukeWorker's model Projection. Colored by status. How far ahead you can see depends on your plan.
Aug2025SepOctNovDecJan2026FebMarAprMayJunJulAugOnline: Jul 12, 2025 to Jul 22, 2025Scram: Jul 23, 2025 to Jul 24, 2025Reduced Power: Jul 25, 2025 to Jul 26, 2025Online: Jul 27, 2025 to Jul 31, 2025Power Ascension: Aug 1, 2025 to Aug 4, 2025Online: Aug 5, 2025 to Aug 7, 2025Power Ascension: Aug 8, 2025 to Aug 14, 2025Online: Aug 15, 2025 to Nov 12, 2025Forced Outage: Nov 13, 2025 to Nov 16, 2025Reduced Power: Nov 17, 2025 to Nov 19, 2025Power Ascension: Nov 20, 2025Online: Nov 21, 2025 to Dec 10, 2025Reduced Power: Dec 11, 2025Online: Dec 12, 2025 to Jan 15, 2026Reduced Power: Jan 16, 2026Online: Jan 17, 2026 to Feb 4, 2026Coastdown: Feb 5, 2026 to Feb 6, 2026Online: Feb 7, 2026 to Feb 13, 2026Coastdown: Feb 14, 2026 to Mar 22, 2026Refueling Outage: Mar 23, 2026 to May 4, 2026Power Ascension: May 5, 2026 to May 21, 2026Online: May 22, 2026 to May 24, 2026Reduced Power: May 25, 2026Online: May 26, 2026 to Jul 12, 2026Scram (reactor trip): Jul 22, 2025Today
OnlineReduced PowerCoastdownPower AscensionRefueling OutageForced OutageScramScram (reactor trip)
Full history & analysis →
?
Composite Operational Excellence Score for Susquehanna 1 — average percentile rank across 7 publicly observable metrics in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). Toggle the time window (3yr / 5yr / Lifetime) to see how this unit's standing shifts. Each dimension percentile-ranked across the active US fleet. Sub-score = average of components. Composite = average of the three sub-scores.

NukeWorker's Operational Excellence Score 5-yr composite · ranks 75 of 93

NukeWorker scores Susquehanna 1's operational excellence at 33 out of 100 over the past five years, ranking it 75 of 93 reactors in the active US fleet. The score blends reliability, efficiency, and operating discipline drawn from public performance data.
Time window
NukeWorker's
Operational
Excellence Score
33/100
Bottom Quartile · #75/93
5-year window

Susquehanna 1 ranks #75 of 93 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: B2B Avg Streak (68th percentile). Weakest: Scrams (5-year) (7th percentile).

Reliability
42
Capacity factor + Forced outages + B2B streaks
Efficiency
48
Fuel utilization + Refuel duration
Discipline
7
Startup duration + Scram count
Cohort Rankings apples-to-apples comparison within each peer group
Reactor type: #25 of 31 BWR
Containment: #8 of 8 Mark II (BWR)
Cycle length: #34 of 40 24-month cycle
Fleet rank above (75 of 93) compares all active US units; cohort ranks compare only against units sharing this property.
Per-dimension breakdown (7 metrics)
Capacity Factor 30th
89.1% (higher better, Reliability)
Forced Outage Days/yr 29th
6.2d (lower better, Reliability)
B2B Avg Streak 68th
675d (higher better, Reliability)
Refuel Duration 48th
33d (lower better, Efficiency)
Scrams (5-year) 7th
1.0/yr (lower better, Discipline)

Each dimension's percentile is computed across the active US fleet (93 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →

Methodology

NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.

How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 93 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.

Active window — 5-year:

  • Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
  • Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
  • Discipline — robust mean startup duration, scrams/yr (5yr, annualised)

Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.

What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.

Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.

Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.

Refresh cadence: recomputed daily. Each window cached separately.

A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.

5-yr trend: 2021: 36/100 (#68/93)2022: 37/100 (#65/92)2023: 30/100 (#76/92)2024: 36/100 (#71/93)2025: 34/100 (#73/93)2026: 32/100 (#75/93) Stable vs 2025
Compare Susquehanna 1 head-to-head with up to 3 other units. Compare now

Capacity Factor (365-Day)

?
100%
Current
82.3%
365-Day Avg
#92
of 94 plants
Min: 0% Max: 100% 60 days <80%

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Susquehanna 1 has completed 14 scheduled refueling outages on record, averaging 43 days each. The most recent, in Mar 2026, ran 43 days.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.
Over the past 12 months Susquehanna 1 has run at an average of 82.3% of rated power. On the chart, green stretches are full-power running and dips toward zero mark reduced output or outages.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Susquehanna 1 has spent 605 days in scheduled refueling outages and 271 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Susquehanna 1 has operated for about 43.1 years and averaged a 88% lifetime capacity factor, generating roughly 264.7 TWh of electricity. Its longest unbroken run reached 716 days.
Lifecycle & Tenure
Operating Age: 43.1 Yrs
Build Time: 9.6 Yrs
Lic. Remaining: 16 Yrs
Production & Power
Lifetime CF: 88%
Efficiency: 31.6%
Generated: 264.7 TWh
Reliability & Outages
Record Run: 716 Days
Refuelings: 14
Avg Startup: 13.4 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
634 Salem Boulevard
Berwick, PA 18603, USA
Get Directions
Phone: (717) 542-3300

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, PA

Unemployment Benefits PA

?
Maximum state unemployment insurance benefits for PA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$605
Max Weekly
26
Max Weeks
$15,730
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Talen Energy
Architect Engineer: BECH
Constructor: BECH

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 2
NSS Supplier: GE 4
Thermal Power: 3952 MWt
Net Capacity: 1247 MWe
Efficiency: 31.6%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000387
License #: NPF-14
License Type: OL-FP
Const. Permit: 1973-11-03
Operating Lic: 1982-07-17
Commercial Op: 1983-06-08
License Renewed: 2009-11-17
License Exp: 2042-07-17

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: RFC — Reliability First Corporation
Census Region: MAT — Middle Atlantic
Balancing Authority: PJM — PJM Interconnection (ISO/RTO)
Market Structure: Merchant — Competitive generator selling into wholesale markets