Turkey Point 3

Online · 100% power

NextEra Energy·Florida City, FL·PWR·837 MWe

Data refreshed 13.4h ago Rx Status: Oct 23, 2026 at 5:36 AM (M-F)

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.
Nov2025DecJan2026FebMarAprMayJunJulAugSepOctNovOnline: Oct 24, 2025 to Feb 2, 2026Reduced Power: Feb 3, 2026Refueling Outage (TP3-35): Feb 4, 2026 to May 11, 2026TP3-35Power Ascension: May 12, 2026 to May 20, 2026Online: May 21, 2026 to Jul 18, 2026Reduced Power: Jul 19, 2026 to Jul 23, 2026Online: Jul 24, 2026 to Oct 24, 2026Today
OnlineReduced PowerPower AscensionRefueling Outage
?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Days of continuous operation since the last outage ended (Started 2026-05-11). Clean run (no forced outages since last refueling).
166
Current Run
days ✔
?
Longest recorded period of continuous operation between outages (2021-11-19 to 2023-04-08).
505
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold set for this unit with no trips to 0% power.
0
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power).
87.7%
Capacity Factor
?
Net electricity actually generated over the most recent 12 months reported by the U.S. EIA (Form EIA-923), summed across every unit at this plant. Authoritative actuals, not an estimate.
12.76 TWh
Net Generation
EIA-923 · 12 mo to 2026-07 · plant total
?
Total number of scheduled refueling outages detected in the historical data.
18
Outages
since 1999
?
Average time from first power generation (>0%) to sustained full power (≥95% for 2+ days) across the last 3 scheduled outages. Click to compare against the fleet on the Operator Efficiency Leaderboard.
7
Avg Startup
days (last 3)
?
Average fuel utilization — percent of the designed fuel cycle that this unit consumes before refueling, derived from the historical burn-down trajectory. Higher = more efficient operator (refuels with less margin remaining; closer to coastdown). Computed as 100% minus the unit's average refuel-point fuel %, using the last 3 years where available, otherwise lifetime average. Click to compare against the fleet on the Operator Efficiency Leaderboard.
93.6%
Fuel Utilization
3yr avg

Reactor Status

Capacity Factor (365-Day)

?
100%
Current
71.4%
365-Day Avg
#86
of 94 plants
Min: 0% Max: 100% 107 days <80%

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Turkey Point 3 has spent 877 days in scheduled refueling outages and 150 days in forced or unplanned outages. Taller bars mark the years with the most downtime.
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.

Outage Duration Trend

Turkey Point 3 has 58 outages plotted here, averaging 18 days each. The most recent, in Feb 2026, was a scheduled refueling outage lasting 97 days.
?
Scheduled refueling outage durations over time. Green bars are at or below this unit's average, amber up to 30% above it, red beyond that. The dashed line is the average. Shorter outages mean better execution.

Refueling Duration Trend

Turkey Point 3 has completed 18 scheduled refueling outages on record, averaging 49 days each. The most recent, in Feb 2026, ran 97 days.
?
Time in days from first power generation (>0%) to sustained full power (≥95% for 2+ consecutive days) after each scheduled refueling outage. The dashed line marks the average. Includes startup testing holds and power dips.

Startup Duration Trend

After a refueling outage, Turkey Point 3 takes about 6 days to climb from first power back to full power. That average is drawn from 17 startups on record, and the most recent took 9 days.
?
Daily reactor power over the 120 days before each scheduled refueling outage, one line per refueling, lined up on the day the outage began. A coastdown is the slow decline as the fuel runs out near the end of a cycle. The highlighted line is the most recent refueling and fainter lines are older. Counts and medians cover coastdowns of a week or longer. A shutdown straight from full power, with no decline ahead of it, is what a forced outage looks like.

Coastdown Before Refueling

3 of 18 refuelings 10 days median 85% power at shutdown 0.6% per day
Turkey Point 3 coasted down for a week or longer before 3 of its 18 refuelings on record. Those coastdowns ran a median of 10 days and ended near 85% power. The most recent refueling, in Feb 2026, began with no extended coastdown.
?
Estimated fuel remaining in the current cycle, expressed as a percentage of the unit's typical cycle. Starts at 100% when the unit returns to power post-refuel and drops as full-power-days are burned. Days at reduced power burn fuel proportionally — so a unit with significant downtime (high burn deficit) drops slower and ends up with MORE fuel left than its calendar position would suggest. Coastdown threshold around 15%. Toggle to overlay past cycles on a normalized "days into cycle" axis to see how aggressively this unit historically burns down before refuel.

Fuel Burn Down Cycle since May 15, 2026

68.6% remaining 3.2 FPD margin
Turkey Point 3 has an estimated 68.6% of its fuel left. Across its last 17 cycles, it has refueled with an average of 3.7% remaining.
Avg refuel: 3.7% Avg refuel (3yr): 6.4% Deepest burn: 0.0% (2000-03 → 2001-09) Most margin: 16.3% (2004-12 → 2006-03)
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.

Power History

Over its operating life, Turkey Point 3 has run at about 87.7% of its rated capacity. Across the last 12 reported months it averaged 70.9%. On the chart, green stretches near the top are full-power running, amber marks reduced power (50 to 89%), and red drops toward zero are outages.

Outage History & Daily Power Log

This table logs every recorded outage for Turkey Point 3, 58 in all since 1999. Of those, 18 were scheduled refueling outages and 40 were unplanned or forced. The typical outage lasted about 18 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
Scheduled TP3-35SGR/Major
2026-02-04 2026-05-11 97 177d 2026-03-07 -31d
Scram # 57857 Auto
2025-08-10 2025-08-11 2 247d - -
Scram # 57453 Auto
2024-12-05 2024-12-06 2 21d - -
Scheduled TP3-34
2024-10-13 2024-11-14 33 354d 2024-10-19 -6d
Scram # 56813 Auto
2023-10-25 2023-10-25 1 32d - -
Scram # 56755 Auto
2023-09-23 2023-09-23 1 49d - -
Scram # 56658 Manual
2023-08-05 2023-08-05 1 92d - -
Scheduled TP3-33
2023-04-08 2023-05-05 28 505d 2023-03-16 +23d
Scheduled TP3-32
2021-10-09 2021-11-19 42 54d 2021-10-04 +5d
Unscheduled
2021-08-14 2021-08-16 3 163d - -
Scram # 55117 Auto
2021-03-02 2021-03-04 3 190d - -
Scram # 54847 Manual
2020-08-18 2020-08-24 7 116d - -
Unscheduled Startup Hold
2020-04-24 2020-04-24 1 2d - -
Scheduled TP3-31
2020-03-30 2020-04-22 24 316d 2020-03-30 0d
Scram # 54072 Manual
2019-05-19 2019-05-19 1 193d - -
Scheduled TP3-30
2018-10-01 2018-11-07 38 308d 2018-10-01 0d
Unscheduled
2017-11-21 2017-11-27 7 70d - -
Unscheduled
2017-09-09 2017-09-12 4 136d - -
Scheduled # 52623 Auto TP3-29
2017-03-19 2017-04-26 39 230d 2017-03-27 -8d
Scram # 52136 Manual
2016-07-30 2016-08-01 3 241d - -
Scheduled TP3-28
2015-10-19 2015-12-02 45 169d 2015-10-18 +1d
Unscheduled
2015-04-30 2015-05-03 4 260d - -
Scram # 50354 Manual
2014-08-12 2014-08-13 2 110d - -
Scheduled TP3-27
2014-03-17 2014-04-24 39 305d 2014-03-17 0d
Scram # 49021 Manual
2013-05-11 2013-05-16 6 59d - -
Scram # 48817 Auto
2013-03-13 2013-03-13 1 3d - -
Scram # 48764 Manual
2013-02-18 2013-03-10 21 4d - -
Scram # 48744 Auto
2013-02-12 2013-02-14 3 166d - -
Unscheduled
2012-08-26 2012-08-30 5 6d - -
Unscheduled
2012-08-19 2012-08-20 2 4d - -
Scheduled TP3-26SGR/Major
2012-02-26 2012-08-15 172 134d 2012-01-30 +27d
Unscheduled
2011-10-04 2011-10-15 12 206d - -
Scram # 46660 Manual
2011-03-07 2011-03-12 6 111d - -
Unscheduled
2010-11-16 2010-11-16 1 9d - -
Scheduled TP3-25
2010-09-24 2010-11-07 45 504d 2010-09-27 -3d
Scheduled TP3-24
2009-03-16 2009-05-08 54 378d 2009-03-01 +15d
Unscheduled
2008-02-27 2008-03-03 6 138d - -
Scheduled TP3-23
2007-09-03 2007-10-12 40 74d 2007-09-10 -7d
Unscheduled
2007-06-19 2007-06-21 3 2d - -
Unscheduled
2007-06-07 2007-06-17 11 425d - -
Scheduled TP3-22
2006-03-06 2006-04-08 34 65d 2006-03-06 0d
Unscheduled
2005-12-30 2005-12-31 2 64d - -
Unscheduled
2005-10-25 2005-10-27 3 7d - -
Unscheduled
2005-10-16 2005-10-18 3 283d - -
Unscheduled
2005-01-04 2005-01-06 3 3d - -
Unscheduled
2004-12-29 2005-01-01 4 11d - -
Unscheduled
2004-12-15 2004-12-18 4 15d - -
Scheduled TP3-21
2004-09-27 2004-11-30 65 495d 2004-09-26 +1d
Unscheduled
2003-05-21 2003-05-21 1 20d - -
Unscheduled
2003-04-29 2003-05-01 3 32d - -
Scheduled TP3-20
2003-03-01 2003-03-28 28 31d 2003-03-01 0d
Unscheduled
2003-01-28 2003-01-29 2 459d - -
Scheduled TP3-19
2001-09-30 2001-10-26 27 44d 2001-09-30 0d
Unscheduled
2001-08-15 2001-08-17 3 4d - -
Unscheduled
2001-08-11 2001-08-11 1 504d - -
Scheduled TP3-18
2000-02-28 2000-03-25 27 103d 2000-02-28 0d
Unscheduled
1999-11-17 1999-11-17 1 146d - -
Unscheduled
1999-06-24 1999-06-24 1 - - -
Page created in 0.240 seconds with 12 queries (cached).