Live reactor status, daily power data, outage history & performance charts, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Braidwood 2.
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Braidwood 2 has logged 10 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 548 days, and its runs average 526 days.
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Braidwood Nuclear Generating Station.
Braidwood Nuclear Generating Station is a two-unit nuclear plant in Reed Township, Will County, Illinois, near Braceville. It is cooled by Braidwood Lake, an artificial lake kept topped up by pumping from the Kankakee River.
Read more
Commonwealth Edison began construction on August 1, 1975. The plant has two Westinghouse four-loop pressurized water reactors. Unit 1 was first connected to the grid on July 12, 1987, and Unit 2 on May 25, 1988. In 2006, Will County residents and the state's attorney sued Exelon over tritium released into local water in violation of its permit.
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Braidwood 2 has operated for about 38 years and averaged a 94.7% lifetime capacity factor, generating roughly 268.5 TWh of electricity. Its longest unbroken run reached 549 days.
Lifecycle & Tenure
Operating Age:38 Yrs
Build Time:12.8 Yrs
Lic. Remaining:21.2 Yrs
Production & Power
Lifetime CF:94.7%
Efficiency:31.7%
Generated:268.5 TWh
Reliability & Outages
Record Run:549 Days
Refuelings:19
Avg Startup:3.6 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Braidwood 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
This unit's composite score and fleet rank
Reliability, Efficiency and Discipline sub-scores
All seven measured inputs, with fleet percentiles
Rank against comparable units, not just the fleet
Three-year, five-year and lifetime windows
Five-year trend, and every other operating US reactor
Included with every outage subscription and with NukeWorker Gold membership. Trading the outage rather than working it? The same record, cut by power market, is on NukeGryd.
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:05000457
License #:NPF-77
License Type:OL-FP
Const. Permit:1975-12-31
Construction Start:1975-08-01 IAEA
Operating Lic:1988-05-20
First Criticality:1988-03-08 IAEA
Grid Connection:1988-05-25 IAEA
Commercial Op:1988-10-17
License Renewed:2016-01-27
License Exp:2047-12-18
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.