Braidwood 2

Online · 100% power

Constellation Energy·Braceville, IL·PWR·1,154 MWe

Live reactor status, daily power data, outage history & performance charts, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Braidwood 2.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
168
Current Run
days
#48 of 95
Mid Quartile
?
Longest recorded period of continuous operation between outages.
549
Record Run
days
#63 of 95
Mid Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (468 days for this 18-month cycle unit) with no trips to 0% power.
10
B2B Runs
#9 of 86
Top Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
94.7%
Capacity Factor
#4 of 95
Top Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
19.62 TWh
Net Generation
EIA-923 · 12 mo to 2026-07 · plant total
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
0
Scrams
?
Years since commercial operation began. License remaining: 21.2 years.
38
Operating Age
years
21.2 yrs remaining

Excellence Score, Records & Plant Facts

ELITE B2B CHAMPION 5+ RUNS CLEAN
4,856 days without a trip  ·  10 Career Runs  · 8 since last trip
Champion since Sep 3, 2015

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Braidwood Nuclear Generating Station.

Braidwood Nuclear Generating Station is a two-unit nuclear plant in Reed Township, Will County, Illinois, near Braceville. It is cooled by Braidwood Lake, an artificial lake kept topped up by pumping from the Kankakee River.

Read more

Commonwealth Edison began construction on August 1, 1975. The plant has two Westinghouse four-loop pressurized water reactors. Unit 1 was first connected to the grid on July 12, 1987, and Unit 2 on May 25, 1988. In 2006, Will County residents and the state's attorney sued Exelon over tritium released into local water in violation of its permit.

24 miles south-southwest of Joilet, Illinois Forum Lodging tips

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Braidwood 2 has operated for about 38 years and averaged a 94.7% lifetime capacity factor, generating roughly 268.5 TWh of electricity. Its longest unbroken run reached 549 days.
Lifecycle & Tenure
Operating Age: 38 Yrs
Build Time: 12.8 Yrs
Lic. Remaining: 21.2 Yrs
Production & Power
Lifetime CF: 94.7%
Efficiency: 31.7%
Generated: 268.5 TWh
Reliability & Outages
Record Run: 549 Days
Refuelings: 19
Avg Startup: 3.6 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Constellation Energy
Architect Engineer: S&L
Constructor: CWE
Ownership, operation and management history
DateChange FromTo
Oct 20, 2000 Merger Commonwealth Edison (Unicom) Exelon
Feb 1, 2022 Spin-off Exelon Constellation Energy
CEG Constellation Energy Corporation NasdaqGS
$270.57 ▲ +11.73 (+4.53%)
Previous Close 258.84
Day's Range 263.12 – 273.21
52-Week Range 228.63 – 406.04
Volume 2,367,383
Delayed quote as of Oct 21, 2026 3:59 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Operational Excellence Score Subscribers

Braidwood 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.

  • This unit's composite score and fleet rank
  • Reliability, Efficiency and Discipline sub-scores
  • All seven measured inputs, with fleet percentiles
  • Rank against comparable units, not just the fleet
  • Three-year, five-year and lifetime windows
  • Five-year trend, and every other operating US reactor

Included with every outage subscription and with NukeWorker Gold membership. Trading the outage rather than working it? The same record, cut by power market, is on NukeGryd.

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: WEST 4LP
Turbine Supplier: WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power: 3645 MWt
Net Capacity: 1154 MWe
Gross Capacity: 1,230 MWe IAEA
Design Capacity: 1,120 MWe IAEA
Efficiency: 31.7%
Status: Operating
Lifetime Output: 341.7 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000457
License #: NPF-77
License Type: OL-FP
Const. Permit: 1975-12-31
Construction Start: 1975-08-01 IAEA
Operating Lic: 1988-05-20
First Criticality: 1988-03-08 IAEA
Grid Connection: 1988-05-25 IAEA
Commercial Op: 1988-10-17
License Renewed: 2016-01-27
License Exp: 2047-12-18

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: RFC — Reliability First Corporation
Census Region: ENC — East North Central
Balancing Authority: PJM — PJM Interconnection (ISO/RTO)
Market Structure: Merchant — Competitive generator selling into wholesale markets