B2B CHAMPION
2,932 days without a trip
·
9 Career Runs · 3 since last trip
Champion since Jul 26, 2021
Breaker-to-Breaker Runs
9 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Peach Bottom 3 has logged 9 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 732 days, and its runs average 711 days.
732
Best Run (days)
P3R20 (2015-10-22) → P3R21 (2017-10-23)
★ Triple breaker-to-breaker
P3R13 → P3R14 → P3R15 → P3R16
All Runs
| 2023-10-29 |
2025-10-13 |
715 days |
P3R24 → P3R25 |
| 2021-11-07 |
2023-10-16 |
708 days |
P3R23 → P3R24 |
| 2019-11-06 |
2021-10-25 |
719 days |
P3R22 → P3R23 |
| 2015-10-22 |
2017-10-23 |
732 days |
P3R20 → P3R21 |
| 2013-10-18 |
2015-09-21 |
703 days |
P3R19 → P3R20 |
| 2011-10-14 |
2013-09-09 |
696 days |
P3R18 → P3R19 |
| 2005-10-16 |
2007-09-24 |
708 days |
P3R15 → P3R16 |
| 2003-10-12 |
2005-09-20 |
709 days |
P3R14 → P3R15 |
| 2001-10-09 |
2003-09-15 |
706 days |
P3R13 → P3R14 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Peach Bottom Nuclear Generating Station.
Peach Bottom Atomic Power Station is in Peach Bottom Township, York County, Pennsylvania, near Delta and about three miles north of the Maryland border. It draws its cooling water from the Susquehanna River.
Read more
Philadelphia Electric Company ordered Unit 1, a General Atomics high-temperature gas-cooled prototype reactor, in 1958. Construction began on February 1, 1962, the unit connected to the grid on January 27, 1967, and it was shut down on November 1, 1974. Units 2 and 3 are General Electric BWR-4 boiling water reactors. Construction began on January 31, 1968, and they entered commercial operation on July 5, 1974 and December 23, 1974.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Peach Bottom 3 has operated for about 51.8 years and averaged a 94.6% lifetime capacity factor, generating roughly 275.7 TWh of electricity. Its longest unbroken run reached 733 days.
Lifecycle & Tenure
Operating Age: 51.8 Yrs
Build Time: 6.9 Yrs
Lic. Remaining: 27.7 Yrs
Production & Power
Lifetime CF: 94.6%
Efficiency: 32%
Generated: 275.7 TWh
Reliability & Outages
Record Run: 733 Days
Refuelings: 14
Avg Startup: 6.6 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Oct 20, 2000 |
Merger |
PECO Energy |
Exelon |
| Feb 1, 2022 |
Spin-off |
Exelon |
Constellation Energy |
CEG
Constellation Energy Corporation
NasdaqGS
$259.06
▼ -4.13 (-1.57%)
Previous Close
263.19
Day's Range
257.78 – 263.90
52-Week Range
228.63 – 406.04
Volume
2,122,743
Operational Excellence Score Subscribers
Peach Bottom 3 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
1 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Peach Bottom 3 has recorded 1 reactor scram, or emergency shutdown, since 2011 (1 automatic, 0 manual). On average the unit was back to full power about 14 days after each trip.
Recent Events
| 2018-09-30 |
Auto |
AUTOMATIC SCRAM DUE TO A LOSS OF TWO CONDENSATE PUMPS "On Su... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
GENERAL ELECTRIC CO. IAEA
Thermal Power:
4016 MWt
Net Capacity:
1285 MWe
Gross Capacity:
1,412 MWe IAEA
Design Capacity:
1,065 MWe IAEA
Efficiency:
32%
Lifetime Output:
392.4 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000278
License #:
DPR-56
License Type:
OL-FP
Const. Permit:
1968-01-31
Construction Start:
1968-01-31 IAEA
Operating Lic:
1974-07-02
First Criticality:
1974-08-07 IAEA
Grid Connection:
1974-09-01 IAEA
Commercial Op:
1974-12-23
License Renewed:
2020-03-05
License Exp:
2054-07-02
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
RFC
— Reliability First Corporation
Census Region:
MAT
— Middle Atlantic
Balancing Authority:
PJM
— PJM Interconnection (ISO/RTO)
Market Structure:
Merchant
— Competitive generator selling into wholesale markets