Peach Bottom 3 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Peach Bottom 3.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
88
Excellence
#2 of 93
Top Quartile
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
257
Current Run
days
#35 of 95
Mid Quartile
?
Longest recorded period of continuous operation between outages.
733
Record Run
days
#15 of 95
Top Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (628 days for this 24-month cycle unit) with no trips to 0% power.
9
B2B Runs
#18 of 86
Top Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
94.5%
Capacity Factor
#5 of 95
Top Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
21.98 TWh
Net Generation
EIA-923 · 12 mo to 2026-04 · plant total
?
Community rating score (Bayesian-adjusted). Based on 38 votes. Ranked against all rated facilities.
42.3
Rating
38 votes
#88 of 97
Bottom Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
1
Scrams
#3 of 94
Top Quartile
?
Years since commercial operation began. License remaining: 28 years.
51.6
Operating Age
years
28 yrs remaining

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri), the current state, and what is coming: the utility's published Scheduled outage plus, for subscribers, NukeWorker's model Projection. Colored by status. How far ahead you can see depends on your plan.
Aug2025SepOctNovDecJan2026FebMarAprMayJunJulAugOnline: Jul 17, 2025 to Jul 18, 2025Reduced Power: Jul 19, 2025Online: Jul 20, 2025 to Sep 1, 2025Coastdown: Sep 2, 2025 to Oct 12, 2025Refueling Outage: Oct 13, 2025 to Nov 2, 2025Power Ascension: Nov 3, 2025 to Nov 4, 2025Online: Nov 5, 2025 to Nov 23, 2025Reduced Power: Nov 24, 2025Online: Nov 25, 2025 to Mar 13, 2026Reduced Power: Mar 14, 2026Online: Mar 15, 2026 to May 28, 2026Reduced Power: May 29, 2026Online: May 30, 2026 to Jul 17, 2026Today
OnlineReduced PowerCoastdownPower AscensionRefueling Outage
Full history & analysis →
?
Composite Operational Excellence Score for Peach Bottom 3 — average percentile rank across 7 publicly observable metrics in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). Toggle the time window (3yr / 5yr / Lifetime) to see how this unit's standing shifts. Each dimension percentile-ranked across the active US fleet. Sub-score = average of components. Composite = average of the three sub-scores.

NukeWorker's Operational Excellence Score 5-yr composite · ranks 2 of 93

NukeWorker scores Peach Bottom 3's operational excellence at 88 out of 100 over the past five years, ranking it 2 of 93 reactors in the active US fleet. The score blends reliability, efficiency, and operating discipline drawn from public performance data.
Time window
NukeWorker's
Operational
Excellence Score
88/100
Top Quartile · #2/93
5-year window

Peach Bottom 3 ranks #2 of 93 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: B2B Avg Streak (96th percentile). Weakest: Fuel Utilization (66th percentile).

Reliability
96
Capacity factor + Forced outages + B2B streaks
Efficiency
77
Fuel utilization + Refuel duration
Discipline
92
Startup duration + Scram count
Cohort Rankings apples-to-apples comparison within each peer group
Reactor type: #1 of 31 BWR
Containment: #1 of 19 Mark I (BWR)
Cycle length: #2 of 40 24-month cycle
Fleet rank above (2 of 93) compares all active US units; cohort ranks compare only against units sharing this property.
Per-dimension breakdown (7 metrics)
Capacity Factor 96th
96.3% (higher better, Reliability)
Forced Outage Days/yr 95th
0.6d (lower better, Reliability)
B2B Avg Streak 96th
711d (higher better, Reliability)
Fuel Utilization 66th
98.3% (higher better, Efficiency)
Refuel Duration 88th
20d (lower better, Efficiency)
Startup Duration 93th
2.9d (lower better, Discipline)
Scrams (5-year) 90th
0.0/yr (lower better, Discipline)

Each dimension's percentile is computed across the active US fleet (93 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →

Methodology

NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.

How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 93 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.

Active window — 5-year:

  • Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
  • Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
  • Discipline — robust mean startup duration, scrams/yr (5yr, annualised)

Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.

What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.

Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.

Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.

Refresh cadence: recomputed daily. Each window cached separately.

A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.

5-yr trend: 2021: 83/100 (#6/93)2022: 85/100 (#6/92)2023: 95/100 (#1/92)2024: 94/100 (#1/93)2025: 91/100 (#1/93)2026: 92/100 (#1/93) Stable vs 2025
Compare Peach Bottom 3 head-to-head with up to 3 other units. Compare now

Capacity Factor (365-Day)

?
100%
Current
92%
365-Day Avg
#78
of 94 plants
Min: 0% Max: 100% 26 days <80%
B2B CHAMPION
2,838 days without a trip  ·  9 Career Runs  · 3 since last trip
Champion since Jul 26, 2021

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Peach Bottom 3 has completed 14 scheduled refueling outages on record, averaging 24 days each. The most recent, in Oct 2025, ran 21 days.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.
Over the past 12 months Peach Bottom 3 has run at an average of 92% of rated power. On the chart, green stretches are full-power running and dips toward zero mark reduced output or outages.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Peach Bottom 3 has spent 332 days in scheduled refueling outages and 23 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Peach Bottom 3 has operated for about 51.6 years and averaged a 94.5% lifetime capacity factor, generating roughly 272.8 TWh of electricity. Its longest unbroken run reached 733 days.
Lifecycle & Tenure
Operating Age: 51.6 Yrs
Build Time: 6.9 Yrs
Lic. Remaining: 28 Yrs
Production & Power
Lifetime CF: 94.5%
Efficiency: 32%
Generated: 272.8 TWh
Reliability & Outages
Record Run: 733 Days
Refuelings: 14
Avg Startup: 6.6 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
1848 Lay Road
Delta, PA 17563, USA
Get Directions
Phone: (717) 456-7014

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$123
Lodging/Night
$74
M&IE/Day
$197
Total/Day
Lancaster, Lancaster County, PA

Unemployment Benefits PA

?
Maximum state unemployment insurance benefits for PA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$605
Max Weekly
26
Max Weeks
$15,730
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Constellation Energy
Architect Engineer: BECH
Constructor: BECH

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 4
Thermal Power: 4016 MWt
Net Capacity: 1285 MWe
Efficiency: 32%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000278
License #: DPR-56
License Type: OL-FP
Const. Permit: 1968-01-31
Operating Lic: 1974-07-02
Commercial Op: 1974-12-23
License Renewed: 2020-03-05
License Exp: 2054-07-02

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: RFC — Reliability First Corporation
Census Region: MAT — Middle Atlantic
Balancing Authority: PJM — PJM Interconnection (ISO/RTO)
Market Structure: Merchant — Competitive generator selling into wholesale markets