B2B CHAMPION
850 days without a trip
·
9 Career Runs · 1 since last trip
Champion since Jun 29, 2026
Breaker-to-Breaker Runs
9 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Vogtle 2 has logged 9 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 530 days, and its runs average 505 days.
530
Best Run (days)
2R14 (2010-04-07) → 2R15 (2011-09-19)
★ Double breaker-to-breaker
2R7 → 2R8 → 2R9
All Runs
| 2025-04-02 |
2026-09-13 |
529 days |
2R24 → 2R25 |
| 2022-04-06 |
2023-09-10 |
522 days |
2R22 → 2R23 |
| 2020-11-18 |
2022-03-06 |
473 days |
2R21 → 2R22 |
| 2017-10-04 |
2019-03-11 |
523 days |
2R19 → 2R20 |
| 2016-05-26 |
2017-09-18 |
480 days |
2R18 → 2R19 |
| 2010-04-07 |
2011-09-19 |
530 days |
2R14 → 2R15 |
| 2007-05-02 |
2008-09-15 |
502 days |
2R12 → 2R13 |
| 2001-05-05 |
2002-10-06 |
519 days |
2R8 → 2R9 |
| 1999-12-31 |
2001-04-08 |
464 days |
2R7 → 2R8 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Plant Vogtle.
Alvin W. Vogtle Electric Generating Plant is in Burke County, Georgia, near Waynesboro, on the Savannah River, which is its cooling source.
Read more
Units 1 and 2 are Westinghouse four-loop pressurized water reactors. Construction began on August 1, 1976, and commercial operation began on June 1, 1987, for Unit 1 and May 20, 1989, for Unit 2. A loss of vital power at both units in 1990 led to a site area emergency, later downgraded to an alert. Units 3 and 4 are Westinghouse AP1000 reactors, with construction beginning on March 12, 2013, and November 19, 2013. Westinghouse filed for bankruptcy in 2017, and Southern Nuclear took over construction management. Unit 3 entered commercial operation on July 31, 2023, and Unit 4 on April 29, 2024.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Vogtle 2 has operated for about 37.4 years and averaged a 92% lifetime capacity factor, generating roughly 258.2 TWh of electricity. Its longest unbroken run reached 541 days.
Lifecycle & Tenure
Operating Age: 37.4 Yrs
Build Time: 14.9 Yrs
Lic. Remaining: 22.3 Yrs
Production & Power
Lifetime CF: 92%
Efficiency: 31.8%
Generated: 258.2 TWh
Reliability & Outages
Record Run: 541 Days
Refuelings: 19
Avg Startup: 4.7 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
SO
The Southern Company
NYSE
$90.55
▼ -0.16 (-0.18%)
Previous Close
90.71
Day's Range
90.27 – 91.01
52-Week Range
81.69 – 99.58
Volume
2,542,341
Operational Excellence Score Subscribers
Vogtle 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
10 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Vogtle 2 has recorded 10 reactor scrams, or emergency shutdowns, since 2011 (6 automatic, 4 manual). On average the unit was back to full power about 11 days after each trip.
Recent Events
| 2020-11-12 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO TURBINE TRIP "At 1732 EST on N... |
|
| 2019-07-19 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO MAIN STEAM ISOLATION VALVE FAI... |
|
| 2019-03-30 |
Manual |
MANUAL REACTOR TRIP DUE TO MSIV FAILING CLOSED "At 2130 [EDT... |
|
| 2016-05-25 |
Auto |
AUTOMATIC REACTOR TRIP ON LOWERING STEAM GENERATOR WATER LEV... |
|
| 2015-03-14 |
Auto |
AUTOMATIC REACTOR TRIP ON SYSTEM INJECTION ACTUATION SIGNAL ... |
|
| 2014-10-12 |
Manual |
MANUAL REACTOR TRIP DURING REACTOR STARTUP "VEGP [Vogtle Ele... |
|
| 2014-04-08 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO LOW STEAM GENERATOR LEVEL "VEG... |
|
| 2013-10-22 |
Manual |
MANUAL REACTOR TRIP DUE TO DECREASING CONDENSER VACUUM "At 1... |
|
+2 more events
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
GENERAL ELECTRIC CO. IAEA
Thermal Power:
3626 MWt
Net Capacity:
1152 MWe
Gross Capacity:
1,229 MWe IAEA
Design Capacity:
1,101 MWe IAEA
Efficiency:
31.8%
Lifetime Output:
340.0 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000425
License #:
NPF-81
License Type:
OL-FP
Const. Permit:
1974-06-28
Construction Start:
1976-08-01 IAEA
Operating Lic:
1989-03-31
First Criticality:
1989-03-28 IAEA
Grid Connection:
1989-04-10 IAEA
Commercial Op:
1989-05-20
License Renewed:
2009-06-03
License Exp:
2049-02-09
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
SERC
— SERC Reliability Corporation
Census Region:
SAT
— South Atlantic
Balancing Authority:
SOCO
— Southern Company
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)