Reactor Status Timeline
Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.Fuel Burn Down Cycle since Apr 2, 2025
NukeWorker's Operational Excellence Score 5-yr composite · ranks 21 of 93 ↑1
Operational
Excellence Score
Vogtle 2 ranks #21 of 93 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: Capacity Factor (90th percentile). Weakest: B2B Avg Streak (21th percentile).
Per-dimension breakdown (7 metrics)
Each dimension's percentile is computed across the active US fleet (93 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →
Methodology
NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.
How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 93 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.
Active window — 5-year:
- Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
- Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
- Discipline — robust mean startup duration, scrams/yr (5yr, annualised)
Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.
What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.
Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.
Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.
Refresh cadence: recomputed daily. Each window cached separately.
A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.
Capacity Factor (365-Day)
Breaker-to-Breaker Runs 9 runs
| 2025-04-02 | Active | 506 days | 2R24 → present |
| 2022-04-06 | 2023-09-10 | 522 days | 2R22 → 2R23 |
| 2020-11-18 | 2022-03-06 | 473 days | 2R21 → 2R22 |
| 2017-10-04 | 2019-03-11 | 523 days | 2R19 → 2R20 |
| 2016-05-26 | 2017-09-18 | 480 days | 2R18 → 2R19 |
| 2010-04-07 | 2011-09-19 | 530 days | 2R14 → 2R15 |
| 2007-05-02 | 2008-09-15 | 502 days | 2R12 → 2R13 |
| 2001-05-05 | 2002-10-06 | 519 days | 2R8 → 2R9 |
| 1999-12-31 | 2001-04-08 | 464 days | 2R7 → 2R8 |
Scram History 10 events since 2011
Outage Duration Trend
?Power History (12-Month)
?Outage Days by Year
?Facility Statistics
NukeWorker Member Ratings 37 votes
Facility Map
33.1418, -81.7621
