Vogtle 4 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Vogtle 4.

?
This unit hasn't completed enough refueling cycles yet to be ranked. The Operational Excellence Score will appear after the unit's second scheduled refuel.
Excellence
Provisional
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
285
Current Run
days
#26 of 95
Mid Quartile
?
Longest recorded period of continuous operation between outages.
285
Record Run
days
#95 of 95
Bottom Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (622 days for this 24-month cycle unit) with no trips to 0% power.
--
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
70.2%
Capacity Factor
#94 of 95
Bottom Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
36.87 TWh
Net Generation
EIA-923 · 12 mo to 2026-04 · plant total
?
Community rating score (Bayesian-adjusted). Based on 37 votes. Ranked against all rated facilities.
61.4
Rating
37 votes
#13 of 97
Top Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
1
Scrams
#1 of 94
Top Quartile
?
Years since commercial operation began. License remaining: 35.7 years.
2.2
Operating Age
years
35.7 yrs remaining

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri), the current state, and what is coming: the utility's published Scheduled outage plus, for subscribers, NukeWorker's model Projection. Colored by status. How far ahead you can see depends on your plan.
Aug2025SepOctNovDecJan2026FebMarAprMayJunJulAugOnline: Jul 18, 2025 to Aug 19, 2025Coastdown: Aug 20, 2025 to Sep 6, 2025Refueling Outage: Sep 7, 2025 to Oct 6, 2025Power Ascension: Oct 7, 2025 to Oct 9, 2025Online: Oct 10, 2025 to Mar 13, 2026Reduced Power: Mar 14, 2026 to Mar 23, 2026Online: Mar 24, 2026 to Jul 18, 2026Today
OnlineReduced PowerCoastdownPower AscensionRefueling Outage
Full history & analysis →
Vogtle 4 needs more refueling history before it can be ranked on the Operational Excellence Score. Check back after the next scheduled refuel.

Capacity Factor (365-Day)

?
100%
Current
88.9%
365-Day Avg
#86
of 94 plants
Min: 0% Max: 100% 44 days <80%

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Vogtle 4 has completed 1 scheduled refueling outage on record, averaging 30 days each. The most recent, in Sep 2025, ran 30 days.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.
Over the past 12 months Vogtle 4 has run at an average of 88.9% of rated power. On the chart, green stretches are full-power running and dips toward zero mark reduced output or outages.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Vogtle 4 has spent 30 days in scheduled refueling outages and 31 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Vogtle 4 has operated for about 2.2 years and averaged a 70.2% lifetime capacity factor, generating roughly 19.9 TWh of electricity. Its longest unbroken run reached 285 days.
Lifecycle & Tenure
Operating Age: 2.2 Yrs
Build Time: 49.8 Yrs
Lic. Remaining: 35.7 Yrs
Production & Power
Lifetime CF: 70.2%
Efficiency: 30.8%
Generated: 19.9 TWh
Reliability & Outages
Record Run: 285 Days
Refuelings: 1
Avg Startup: 20.5 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
7821 River Road
Waynesboro, GA 30830, USA
Get Directions
Phone: (706) 724-1562

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, GA

Unemployment Benefits GA

?
Maximum state unemployment insurance benefits for GA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$365
Max Weekly
20
Max Weeks
$7,300
Max Total

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Southern Nuclear
Architect Engineer: SBEC
Constructor: GPC

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: AP1000
Containment: PWR-DRYAMB
NSS Supplier: WEST 2LP
Thermal Power: 3626 MWt
Net Capacity: 1117 MWe
Efficiency: 30.8%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05200026
License #: NPF-92
License Type: OL-FP
Const. Permit: 1974-06-28
Operating Lic: 2022-03-17
Commercial Op: 2024-04-29
License Exp: 2062-03-17

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: SERC — SERC Reliability Corporation
Census Region: SAT — South Atlantic
Balancing Authority: SOCO — Southern Company
Market Structure: Regulated — Rate-regulated utility (cost-of-service pricing)