Vogtle 4

Online · 100% power

Southern Nuclear·Waynesboro, GA·AP1000·1,117 MWe

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.
Nov2025DecJan2026FebMarAprMayJunJulAugSepOctNovOnline: Oct 22, 2025 to Mar 13, 2026Reduced Power: Mar 14, 2026 to Mar 23, 2026Online: Mar 24, 2026 to Aug 31, 2026Reduced Power: Sep 1, 2026 to Sep 2, 2026Online: Sep 3, 2026 to Oct 22, 2026Today
OnlineReduced Power

Reactor Status

Capacity Factor (365-Day)

?
100%
Current
98%
365-Day Avg
#75
of 94 plants
Min: 30% Max: 100% 11 days <80%

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Vogtle 4 has spent 30 days in scheduled refueling outages and 31 days in forced or unplanned outages. Taller bars mark the years with the most downtime.
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.

Outage Duration Trend

Vogtle 4 has 6 outages plotted here, averaging 10 days each. The most recent, in Sep 2025, was a scheduled refueling outage lasting 30 days.
?
Estimated fuel remaining in the current cycle, expressed as a percentage of the unit's typical cycle. Starts at 100% when the unit returns to power post-refuel and drops as full-power-days are burned. Days at reduced power burn fuel proportionally — so a unit with significant downtime (high burn deficit) drops slower and ends up with MORE fuel left than its calendar position would suggest. Coastdown threshold around 15%. Toggle to overlay past cycles on a normalized "days into cycle" axis to see how aggressively this unit historically burns down before refuel.

Fuel Burn Down Cycle since Oct 7, 2025

30.3% remaining 8.2 FPD margin
Vogtle 4 has an estimated 30.3% of its fuel left.
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.

Power History

Over its operating life, Vogtle 4 has run at about 72.7% of its rated capacity. Across the last 12 reported months it averaged 98.0%. On the chart, green stretches near the top are full-power running, amber marks reduced power (50 to 89%), and red drops toward zero are outages.

Outage History & Daily Power Log

This table logs every recorded outage for Vogtle 4, 7 in all since 2023. Of those, 1 was scheduled refueling outage and 6 were unplanned or forced. The typical outage lasted about 35 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
Scheduled 4R01
2025-09-07 2025-10-06 30 156d 2025-09-07 0d
Unscheduled
2025-03-24 2025-04-04 12 288d - -
Scram # 57164 Manual
2024-06-06 2024-06-09 4 45d - -
Unscheduled
2024-04-13 2024-04-22 10 5d - -
Unscheduled
2024-04-08 2024-04-08 1 30d - -
Unscheduled
2024-03-06 2024-03-09 4 13d - -
Unscheduled
2023-08-21 2024-02-22 186 - - -