McGuire 1

Online · 100% power

Duke Energy·Huntersville, NC·PWR·1,158 MWe

Data refreshed 11.1h ago Rx Status: Oct 19, 2026 at 5:12 AM (M-F)

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.
Nov2025DecJan2026FebMarAprMayJunJulAugSepOctNovOnline: Oct 19, 2025 to Nov 10, 2025Reduced Power: Nov 11, 2025Online: Nov 12, 2025 to Dec 11, 2025Reduced Power: Dec 12, 2025 to Dec 15, 2025Online: Dec 16, 2025 to Dec 29, 2025Scram: Dec 30, 2025 to Jan 2, 2026Reduced Power: Jan 3, 2026 to Jan 5, 2026Online: Jan 6, 2026 to Aug 18, 2026Coastdown: Aug 19, 2026 to Sep 4, 2026Refueling Outage (M1R31): Sep 5, 2026 to Oct 3, 2026M1R31Power Ascension: Oct 4, 2026 to Oct 6, 2026Online: Oct 7, 2026 to Oct 19, 2026Scram (reactor trip): Dec 29, 2025Today
OnlineReduced PowerCoastdownPower AscensionRefueling OutageScram⚡Scram (reactor trip)
?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Days of continuous operation since the last outage ended (Started 2026-10-03). Clean run (no forced outages since last refueling).
16
Current Run
days ✔
?
Longest recorded period of continuous operation between outages (2020-10-20 to 2022-04-02).
529
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold set for this unit with no trips to 0% power.
7
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power).
91.6%
Capacity Factor
?
Net electricity actually generated over the most recent 12 months reported by the U.S. EIA (Form EIA-923), summed across every unit at this plant. Authoritative actuals, not an estimate.
19 TWh
Net Generation
EIA-923 · 12 mo to 2026-07 · plant total
?
Total number of scheduled refueling outages detected in the historical data.
19
Outages
since 1999
?
Average time from first power generation (>0%) to sustained full power (≥95% for 2+ days) across the last 3 scheduled outages. Click to compare against the fleet on the Operator Efficiency Leaderboard.
2.3
Avg Startup
days (last 3)
?
Average fuel utilization — percent of the designed fuel cycle that this unit consumes before refueling, derived from the historical burn-down trajectory. Higher = more efficient operator (refuels with less margin remaining; closer to coastdown). Computed as 100% minus the unit's average refuel-point fuel %, using the last 3 years where available, otherwise lifetime average. Click to compare against the fleet on the Operator Efficiency Leaderboard.
99.0%
Fuel Utilization
3yr avg

Reactor Status

Capacity Factor (365-Day)

?
100%
Current
89%
365-Day Avg
#78
of 94 plants
Min: 0% Max: 100% 42 days <80%

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, McGuire 1 has spent 706 days in scheduled refueling outages and 59 days in forced or unplanned outages. Taller bars mark the years with the most downtime.
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.

Outage Duration Trend

McGuire 1 has 33 outages plotted here, averaging 23 days each. The most recent, in Sep 2026, was a scheduled refueling outage lasting 29 days.
?
Scheduled refueling outage durations over time. Green bars are at or below this unit's average, amber up to 30% above it, red beyond that. The dashed line is the average. Shorter outages mean better execution.

Refueling Duration Trend

McGuire 1 has completed 19 scheduled refueling outages on record, averaging 37 days each. The most recent, in Sep 2026, ran 29 days.
?
Time in days from first power generation (>0%) to sustained full power (≥95% for 2+ consecutive days) after each scheduled refueling outage. The dashed line marks the average. Includes startup testing holds and power dips.

Startup Duration Trend

After a refueling outage, McGuire 1 takes about 3 days to climb from first power back to full power. That average is drawn from 19 startups on record, and the most recent took 3 days.
?
Daily reactor power over the 120 days before each scheduled refueling outage, one line per refueling, lined up on the day the outage began. A coastdown is the slow decline as the fuel runs out near the end of a cycle. The highlighted line is the most recent refueling and fainter lines are older. Counts and medians cover coastdowns of a week or longer. A shutdown straight from full power, with no decline ahead of it, is what a forced outage looks like.

Coastdown Before Refueling

6 of 19 refuelings 17 days median 92% power at shutdown 0.3% per day
McGuire 1 coasted down for a week or longer before 6 of its 19 refuelings on record. Those coastdowns ran a median of 17 days and ended near 92% power. The most recent refueling, in Sep 2026, followed a 17-day coastdown from 97% to 92%.
?
Estimated fuel remaining in the current cycle, expressed as a percentage of the unit's typical cycle. Starts at 100% when the unit returns to power post-refuel and drops as full-power-days are burned. Days at reduced power burn fuel proportionally — so a unit with significant downtime (high burn deficit) drops slower and ends up with MORE fuel left than its calendar position would suggest. Coastdown threshold around 15%. Toggle to overlay past cycles on a normalized "days into cycle" axis to see how aggressively this unit historically burns down before refuel.

Fuel Burn Down Cycle since Oct 4, 2026

97.1% remaining 0.7 FPD margin
McGuire 1 has an estimated 97.1% of its fuel left. Across its last 18 cycles, it has refueled with an average of 1.4% remaining.
Avg refuel: 1.4% Avg refuel (3yr): 1.0% Deepest burn: 0.0% (2001-04 → 2002-09) Most margin: 5.8% (2007-05 → 2008-09)
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.

Power History

Over its operating life, McGuire 1 has run at about 91.6% of its rated capacity. Across the last 12 reported months it averaged 88.1%. On the chart, green stretches near the top are full-power running, amber marks reduced power (50 to 89%), and red drops toward zero are outages.

Outage History & Daily Power Log

This table logs every recorded outage for McGuire 1, 33 in all since 1999. Of those, 19 were scheduled refueling outages and 14 were unplanned or forced. The typical outage lasted about 23 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
Scheduled M1R31
2026-09-05 2026-10-03 29 246d 2026-09-05 0d
Scram # 58101 Auto
2025-12-30 2026-01-02 4 254d - -
Scheduled M1R30
2025-04-02 2025-04-20 19 526d 2025-03-29 +4d
Scheduled M1R29
2023-09-16 2023-10-24 39 496d 2023-09-16 0d
Scheduled M1R28
2022-04-02 2022-05-08 37 529d 2022-03-26 +7d
Scheduled M1R27
2020-09-19 2020-10-20 32 504d 2020-09-26 -7d
Scram # 54047 Auto
2019-05-04 2019-05-04 1 18d - -
Scheduled M1R26
2019-03-23 2019-04-16 25 399d 2019-03-23 0d
Scram # 53217 Auto
2018-02-17 2018-02-17 1 124d - -
Scheduled M1R25
2017-09-23 2017-10-16 24 525d 2017-09-23 0d
Scheduled M1R24
2016-03-19 2016-04-16 29 400d 2016-03-19 0d
Unscheduled
2015-02-07 2015-02-13 7 85d - -
Scheduled M1R23
2014-09-13 2014-11-14 63 302d 2014-09-13 0d
Scram # 49538 Manual
2013-11-15 2013-11-15 1 207d - -
Scheduled M1R22
2013-03-17 2013-04-22 37 22d 2013-03-16 +1d
Scram # 48775 Auto
2013-02-22 2013-02-23 2 497d - -
Scheduled M1R21
2011-09-18 2011-10-14 27 237d 2011-09-17 +1d
Scram # 46559 Manual
2011-01-21 2011-01-24 4 221d - -
Unscheduled
2010-06-13 2010-06-14 2 57d - -
Scheduled M1R20
2010-03-14 2010-04-17 35 487d 2010-03-13 +1d
Scheduled M1R19
2008-09-21 2008-11-12 53 84d 2008-09-20 +1d
Unscheduled
2008-06-27 2008-06-29 3 397d - -
Scheduled M1R18SGR/Major
2007-03-11 2007-05-27 78 448d 2007-03-10 +1d
Unscheduled
2005-12-17 2005-12-18 2 60d - -
Scheduled M1R17
2005-09-18 2005-10-18 31 312d 2005-09-17 +1d
Unscheduled
2004-10-19 2004-11-10 23 191d - -
Scheduled M1R16
2004-03-07 2004-04-11 36 515d 2004-03-06 +1d
Scheduled M1R15
2002-09-14 2002-10-09 26 192d 2002-09-14 0d
Unscheduled
2002-03-05 2002-03-06 2 323d - -
Scheduled M1R14
2001-03-10 2001-04-16 38 41d 2001-03-10 0d
Unscheduled
2001-01-24 2001-01-28 5 242d - -
Unscheduled
2000-05-26 2000-05-27 2 204d - -
Scheduled M1R13
1999-09-18 1999-11-04 48 - 1999-09-18 0d