Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
Excellence
ranked of 93
Subscribers
?
Current reactor power level from the most recent NRC daily report.
0%
Power
OFFLINE (6 Days)
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
--
Current Run
days
#93 of 95
Bottom Quartile
?
Longest recorded period of continuous operation between outages.
529
Record Run
days
#86 of 95
Bottom Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (457 days for this 18-month cycle unit) with no trips to 0% power.
7
B2B Runs
#25 of 87
Mid Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
91.8%
Capacity Factor
#28 of 95
Mid Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
19 TWh
Net Generation
EIA-923 · 12 mo to 2026-06 · plant total
?
Community rating score (Bayesian-adjusted). Based on 1 vote. Ranked against all rated facilities.
52.3
Rating
1 vote
#50 of 97
Mid Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
6
Scrams
#37 of 94
Mid Quartile
?
Years since commercial operation began. License remaining: 14.8 years.
44.8
Operating Age
years
14.8 yrs remaining
Reactor Status Timeline
Refueling Outage · Day 6 NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.OnlineReduced PowerCoastdownRefueling OutageScram⚡Scram (reactor trip)
Operational Excellence Score Subscribers
McGuire 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Included with every outage subscription and with NukeWorker Gold membership. Trading the outage rather than working it? The same record, cut by power market, is on NukeGryd.
Capacity Factor (365-Day)
0%
Current
95.7%
365-Day Avg
#65
of 94 plants
Min: 0%
Max: 100%
17 days <80%
Breaker-to-Breaker Runs 7 runs
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
McGuire 1 has logged 7 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 528 days, and its runs average 511 days.
528
Best Run (days)
M1R27 (2020-10-21) → M1R28 (2022-04-02)
511
Avg Run (days)
★ Quadruple breaker-to-breaker
M1R26 → M1R27 → M1R28 → M1R29 → M1R30
All Runs
| 2023-10-25 | 2025-04-02 | 525 days | M1R29 → M1R30 |
| 2022-05-09 | 2023-09-16 | 495 days | M1R28 → M1R29 |
| 2020-10-21 | 2022-04-02 | 528 days | M1R27 → M1R28 |
| 2019-05-05 | 2020-09-19 | 503 days | M1R26 → M1R27 |
| 2016-04-17 | 2017-09-23 | 524 days | M1R24 → M1R25 |
| 2008-11-13 | 2010-03-14 | 486 days | M1R19 → M1R20 |
| 2002-10-10 | 2004-03-07 | 514 days | M1R15 → M1R16 |
Scram History 6 events since 2011
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
McGuire 1 has recorded 6 reactor scrams, or emergency shutdowns, since 2011 (4 automatic, 2 manual). On average the unit was back to full power about 5.4 days after each trip.
Outage Duration Trend
?Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
McGuire 1 has completed 19 scheduled refueling outages on record, averaging 36 days each. The most recent, in Sep 2026, ran 6 days.
Power History (12-Month)
?Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.
Over the past 12 months McGuire 1 has run at an average of 95.7% of rated power. On the chart, green stretches are full-power running and dips toward zero mark reduced output or outages.
Outage Days by Year
?Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, McGuire 1 has spent 683 days in scheduled refueling outages and 59 days in forced or unplanned outages. Taller bars mark the years with the most downtime.
Facility Statistics
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
McGuire 1 has operated for about 44.8 years and averaged a 91.8% lifetime capacity factor, generating roughly 256.4 TWh of electricity. Its longest unbroken run reached 529 days.
Lifecycle & Tenure
Operating Age: 44.8 Yrs
Build Time: 8.8 Yrs
Lic. Remaining: 14.8 Yrs
Production & Power
Lifetime CF: 91.8%
Efficiency: 33.9%
Generated: 256.4 TWh
Reliability & Outages
Record Run: 529 Days
Refuelings: 19
Avg Startup: 4.2 Days
NukeWorker Member Ratings 1 vote
Community ratings from NukeWorker members. Vote to share your experience working at this facility. Score uses a Bayesian average that accounts for vote count — facilities with few votes are pulled toward the fleet average, so rankings reflect confidence, not just raw percentages.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
35.4325, -80.9478
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Phone:
(704) 875-4000
Website:
http://www.duke-energy.com/
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, NC
Unemployment Benefits NC
Maximum state unemployment insurance benefits for NC. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$350
Max Weekly
12
Max Weeks
$4,200
Max Total
7-day waiting period before benefits begin
Jobs at McGuire 1 active
Active job listings posted for this specific facility on the NukeWorker job board. Click a job title for details, or the header to see them all.
More Jobs in NC 12 active
Active nuclear industry job listings in NC from the NukeWorker job board. Click a job title for full details, or click the header to search all jobs in this state.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Ownership & Construction
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
DUK
Duke Energy Corporation
NYSE
$119.39
▼ -1.04 (-0.86%)
Previous Close
120.43
Day's Range
119.27 – 121.26
52-Week Range
113.90 – 134.49
Volume
886,210
Delayed quote as of Sep 10, 2026 11:41 AM ET.
Source: Yahoo Finance.
Full quote on Yahoo Finance
Technical Specs
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type:
PWR
Containment:
PWR-ICECND
NSS Supplier:
WEST 4LP
Thermal Power:
3411 MWt
Net Capacity:
1158 MWe
Efficiency:
33.9%
Status:
Operating
Licensing
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000369
License #:
NPF-9
License Type:
OL-FP
Const. Permit:
1973-02-23
Operating Lic:
1981-05-27
Commercial Op:
1981-12-01
License Renewed:
2003-12-05
License Exp:
2041-06-12
Market & Region
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
SERC
— SERC Reliability Corporation
Census Region:
SAT
— South Atlantic
Balancing Authority:
DUK
— Duke Energy Carolinas
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)