Crystal River 3 — Decommissioned Reactor Data & History

Operational history, outage history & performance charts, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Crystal River 3.

Decommissioned

Permanently shut down on 2013-02-05. View Outage History →
?
Current reactor power level from the most recent NRC daily report.
Shut Down
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
4,790
Current Run
days
?
Longest recorded period of continuous operation between outages.
4,790
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (617 days for this 24-month cycle unit) with no trips to 0% power.
--
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
68.2%
Capacity Factor
?
Community rating score (Bayesian-adjusted). Based on 59 votes. Ranked against all rated facilities.
51.5
Rating
59 votes
#52 of 97
Mid Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
0
Scrams
?
Years since commercial operation began.
35.9
Operating Age
years

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Crystal River 3 has completed 5 scheduled refueling outages on record, averaging 35 days each. The most recent, in Nov 2007, ran 34 days.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Crystal River 3 has spent 175 days in scheduled refueling outages and 81 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Crystal River 3 has operated for about 35.9 years and averaged a 68.2% lifetime capacity factor, generating roughly 72.2 TWh of electricity. Its longest unbroken run reached 4,790 days.
Lifecycle & Tenure
Operating Age: 35.9 Yrs
Build Time: 8.5 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 68.2%
Efficiency: 32.9%
Generated: 72.2 TWh
Reliability & Outages
Record Run: 4,790 Days
Refuelings: 6
Avg Startup: 3.8 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
15760 West Power Line Street
Crystal River, FL 34428, USA
Get Directions
Phone: (352) 563-2948

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, FL

Unemployment Benefits FL

?
Maximum state unemployment insurance benefits for FL. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$275
Max Weekly
20
Max Weeks
$5,500
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Duke Energy
Architect Engineer: GIL
Constructor: JONES

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: B&W LLP
Thermal Power: 2544 MWt
Net Capacity: 838 MWe
Efficiency: 32.9%

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000302
License #: DPR-72
License Type: OL-FP
Const. Permit: 1968-09-25
Operating Lic: 1977-01-28
Commercial Op: 1977-03-13
License Exp: 2016-12-03