Fermi 2 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Fermi 2.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
16
Excellence
#90 of 93
Bottom Quartile
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
7
Current Run
days
#94 of 95
Bottom Quartile
?
Longest recorded period of continuous operation between outages.
685
Record Run
days
#40 of 95
Mid Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (604 days for this 24-month cycle unit) with no trips to 0% power.
1
B2B Runs
#83 of 86
Bottom Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
83.4%
Capacity Factor
#91 of 95
Bottom Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923). These are authoritative actuals, not an estimate.
8.69 TWh
Net Generation
EIA-923 · 12 mo to 2026-04
?
Community rating score (Bayesian-adjusted). Based on 60 votes. Ranked against all rated facilities.
57.2
Rating
60 votes
#23 of 97
Top Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
11
Scrams
#81 of 94
Bottom Quartile
?
Years since commercial operation began. License remaining: 18.7 years.
38.5
Operating Age
years
18.7 yrs remaining

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri), the current state, and what is coming: the utility's published Scheduled outage plus, for subscribers, NukeWorker's model Projection. Colored by status. How far ahead you can see depends on your plan.
Aug2025SepOctNovDecJan2026FebMarAprMayJunJulAugOnline: Jul 18, 2025 to Oct 10, 2025Reduced Power: Oct 11, 2025Online: Oct 12, 2025 to Jan 31, 2026Reduced Power: Feb 1, 2026Online: Feb 2, 2026 to Feb 8, 2026Coastdown: Feb 9, 2026 to Mar 1, 2026Online: Mar 2, 2026Coastdown: Mar 3, 2026 to Mar 6, 2026Online: Mar 7, 2026 to Mar 9, 2026Coastdown: Mar 10, 2026 to Mar 22, 2026Refueling Outage: Mar 23, 2026 to May 11, 2026Power Ascension: May 12, 2026 to May 18, 2026Scram: May 19, 2026 to May 21, 2026Power Ascension: May 22, 2026 to Jun 11, 2026Reduced Power: Jun 12, 2026 to Jul 3, 2026Scram: Jul 4, 2026 to Jul 11, 2026Power Ascension: Jul 12, 2026 to Jul 14, 2026Online: Jul 15, 2026Power Ascension: Jul 16, 2026Online: Jul 17, 2026 to Jul 18, 2026Scram (reactor trip): May 18, 2026Scram (reactor trip): Jul 3, 2026Today
OnlineReduced PowerCoastdownPower AscensionRefueling OutageScramScram (reactor trip)
Full history & analysis →
?
Composite Operational Excellence Score for Fermi 2 — average percentile rank across 7 publicly observable metrics in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). Toggle the time window (3yr / 5yr / Lifetime) to see how this unit's standing shifts. Each dimension percentile-ranked across the active US fleet. Sub-score = average of components. Composite = average of the three sub-scores.

NukeWorker's Operational Excellence Score 5-yr composite · ranks 90 of 93

NukeWorker scores Fermi 2's operational excellence at 16 out of 100 over the past five years, ranking it 90 of 93 reactors in the active US fleet. The score blends reliability, efficiency, and operating discipline drawn from public performance data.
Time window
NukeWorker's
Operational
Excellence Score
16/100
Bottom Quartile · #90/93
5-year window

Fermi 2 ranks #90 of 93 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: B2B Avg Streak (71th percentile). Weakest: Scrams (5-year) (7th percentile).

Reliability
34
Capacity factor + Forced outages + B2B streaks
Efficiency
7
Fuel utilization + Refuel duration
Discipline
7
Startup duration + Scram count
Cohort Rankings apples-to-apples comparison within each peer group
Reactor type: #30 of 31 BWR
Containment: #19 of 19 Mark I (BWR)
Cycle length: #39 of 40 24-month cycle
Fleet rank above (90 of 93) compares all active US units; cohort ranks compare only against units sharing this property.
Per-dimension breakdown (7 metrics)
Capacity Factor 10th
82.7% (higher better, Reliability)
Forced Outage Days/yr 22th
7.4d (lower better, Reliability)
B2B Avg Streak 71th
682d (higher better, Reliability)
Refuel Duration 7th
49d (lower better, Efficiency)
Scrams (5-year) 7th
1.0/yr (lower better, Discipline)

Each dimension's percentile is computed across the active US fleet (93 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →

Methodology

NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.

How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 93 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.

Active window — 5-year:

  • Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
  • Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
  • Discipline — robust mean startup duration, scrams/yr (5yr, annualised)

Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.

What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.

Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.

Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.

Refresh cadence: recomputed daily. Each window cached separately.

A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.

5-yr trend: 2021: 41/100 (#62/93)2022: 24/100 (#80/92)2023: 34/100 (#69/92)2024: 19/100 (#88/93)2025: 19/100 (#87/93)2026: 20/100 (#88/93) Stable vs 2025
Compare Fermi 2 head-to-head with up to 3 other units. Compare now

Capacity Factor (365-Day)

?
100%
Current
77.2%
365-Day Avg
#94
of 94 plants
Min: 0% Max: 100% 75 days <80%

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Fermi 2 has completed 17 scheduled refueling outages on record, averaging 50 days each. The most recent, in Mar 2026, ran 50 days.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.
Over the past 12 months Fermi 2 has run at an average of 77.2% of rated power. On the chart, green stretches are full-power running and dips toward zero mark reduced output or outages.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Fermi 2 has spent 845 days in scheduled refueling outages and 396 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Fermi 2 has operated for about 38.5 years and averaged a 83.4% lifetime capacity factor, generating roughly 228.3 TWh of electricity. Its longest unbroken run reached 685 days.
Lifecycle & Tenure
Operating Age: 38.5 Yrs
Build Time: 15.3 Yrs
Lic. Remaining: 18.7 Yrs
Production & Power
Lifetime CF: 83.4%
Efficiency: 32.7%
Generated: 228.3 TWh
Reliability & Outages
Record Run: 685 Days
Refuelings: 17
Avg Startup: 7.4 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
6400 North Dixie Highway
Monroe, MI 48162, USA
Get Directions
Phone: (313) 586-5300

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, MI

Unemployment Benefits MI

?
Maximum state unemployment insurance benefits for MI. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$530
Max Weekly
26
Max Weeks
$13,780
Max Total

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: DTE Energy
Architect Engineer: S&L
Constructor: DANI

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 4
Thermal Power: 3486 MWt
Net Capacity: 1141 MWe
Efficiency: 32.7%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000341
License #: NPF-43
License Type: OL-FP
Const. Permit: 1972-09-26
Operating Lic: 1985-03-20
Commercial Op: 1988-01-23
License Renewed: 2016-12-15
License Exp: 2045-03-20

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: RFC — Reliability First Corporation
Census Region: ENC — East North Central
Balancing Authority: MISO — Midcontinent Independent System Operator (ISO/RTO)
Market Structure: Regulated — Rate-regulated utility (cost-of-service pricing)