Fermi 2 - Status & History

Comprehensive reactor performance metrics, cycle analysis, and historical outage data.

Reactor Status Timeline

Power Ascension · 41% NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri), the current state, and what is coming: the utility's published Scheduled outage plus, for subscribers, NukeWorker's model Projection. Colored by status. How far ahead you can see depends on your plan.
Aug2025SepOctNovDecJan2026FebMarAprMayJunJulAugOnline: Jul 14, 2025 to Oct 10, 2025Reduced Power: Oct 11, 2025Online: Oct 12, 2025 to Jan 31, 2026Reduced Power: Feb 1, 2026Online: Feb 2, 2026 to Feb 8, 2026Coastdown: Feb 9, 2026 to Mar 1, 2026Online: Mar 2, 2026Coastdown: Mar 3, 2026 to Mar 6, 2026Online: Mar 7, 2026 to Mar 9, 2026Coastdown: Mar 10, 2026 to Mar 22, 2026Refueling Outage: Mar 23, 2026 to May 11, 2026Power Ascension: May 12, 2026 to May 18, 2026Scram: May 19, 2026 to May 21, 2026Power Ascension: May 22, 2026 to Jun 11, 2026Reduced Power: Jun 12, 2026 to Jul 3, 2026Scram: Jul 4, 2026 to Jul 11, 2026Power Ascension: Jul 12, 2026 to Jul 14, 2026Scram (reactor trip): May 18, 2026Scram (reactor trip): Jul 3, 2026Today
OnlineReduced PowerCoastdownPower AscensionRefueling OutageScramScram (reactor trip)
?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
20
Excellence
#87 of 93
Bottom Quartile
?
Days of continuous operation since the last outage ended. Clean run (no forced outages since last refueling).
3
Current Run
days ✔
?
Longest recorded period of continuous operation between outages (2024-05-09 to 2026-03-23).
683
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (604 days for this 24-month cycle unit) with no trips to 0% power.
1
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power).
83.4%
Capacity Factor
?
Net electricity actually generated over the most recent 12 months reported by the U.S. EIA (Form EIA-923). Authoritative actuals, not an estimate.
8.69 TWh
Net Generation
EIA-923 · 12 mo to 2026-04
?
Total number of scheduled refueling outages detected in the historical data.
17
Outages
since 1999
?
Average time from first power generation (>0%) to sustained full power (≥95% for 2+ days) across the last 3 scheduled outages. Click to compare against the fleet on the Operator Efficiency Leaderboard.
9.7
Avg Startup
days (last 3)
?
Average fuel utilization — percent of the designed fuel cycle that this unit consumes before refueling, derived from the historical burn-down trajectory. Higher = more efficient operator (refuels with less margin remaining; closer to coastdown). Computed as 100% minus the unit's average refuel-point fuel %, using the last 3 years where available, otherwise lifetime average. Click to compare against the fleet on the Operator Efficiency Leaderboard.
98.9%
Fuel Utilization
3yr avg
?
NukeWorker's Operational Excellence Score is a composite 0–100 ranking of every active US nuclear unit across 7 publicly observable performance metrics, grouped into three sub-scores:
Reliability — capacity factor, forced outage days, B2B avg streak
Efficiency — fuel utilization, refuel duration
Discipline — startup duration, scram count
Each unit's metric is converted to a percentile across the active fleet. Sub-score = average of its components; composite = average of the three sub-scores. Use the time-window toggle below to switch between 3yr / 5yr / lifetime.
Time window — change how far back we look
NukeWorker's
Operational
Excellence Score
20/100
Bottom Quartile · #87/93
5-year window

Fermi 2 ranks #87 of 93 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: B2B Avg Streak (71th percentile). Weakest: Scrams (5-year) (7th percentile).

Reliability
35
Capacity factor + Forced outages + B2B streaks
Efficiency
13
Fuel utilization + Refuel duration
Discipline
12
Startup duration + Scram count
Cohort Rankings apples-to-apples comparison within each peer group
Reactor type: #28 of 31 BWR
Containment: #18 of 19 Mark I (BWR)
Cycle length: #37 of 40 24-month cycle
Fleet rank above (87 of 93) compares all active US units; cohort ranks compare only against units sharing this property.
Per-dimension breakdown (7 metrics)
Capacity Factor 11th
82.6% (higher better, Reliability)
Forced Outage Days/yr 22th
7.4d (lower better, Reliability)
B2B Avg Streak 71th
682d (higher better, Reliability)
Fuel Utilization 18th
95.8% (higher better, Efficiency)
Refuel Duration 7th
49d (lower better, Efficiency)
Startup Duration 17th
6.7d (lower better, Discipline)
Scrams (5-year) 7th
1.0/yr (lower better, Discipline)

Each dimension's percentile is computed across the active US fleet (93 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →

Methodology

NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.

How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 93 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.

Active window — 5-year:

  • Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
  • Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
  • Discipline — robust mean startup duration, scrams/yr (5yr, annualised)

Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.

What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.

Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.

Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.

Refresh cadence: recomputed daily. Each window cached separately.

A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.

5-yr trend: 2021: 41/100 (#62/93)2022: 24/100 (#80/92)2023: 34/100 (#69/92)2024: 19/100 (#88/93)2025: 19/100 (#87/93)2026: 20/100 (#88/93) Stable vs 2025
Compare Fermi 2 head-to-head with up to 3 other units. Compare now
?
Duration of each outage in days, shown chronologically. Green bars are scheduled refueling outages, red bars are forced/unscheduled. The orange dashed line marks the average duration. Extended outages (>180 days) and D&D periods are excluded.

Outage Duration Trend

Fermi 2 has 59 outages plotted here, averaging 21 days each. The most recent, in Jul 2026, was a unplanned outage lasting 8 days.
?
Days between consecutive scheduled refueling outage starts, showing operating cycle regularity. The purple dashed line marks the average cycle length. Most U.S. reactors operate on 18-month (547 day) or 24-month (730 day) cycles.

Cycle Length History

Between refueling outages, Fermi 2 runs about 593 days, or roughly 19 months, per cycle. That average comes from 16 completed cycles, the most recent lasting 730 days.
?
Time in days from first power generation (>0%) to sustained full power (≥95% for 2+ consecutive days) after each scheduled refueling outage. The dashed line marks the average. Includes startup testing holds and power dips.

Startup Duration Trend

After a refueling outage, Fermi 2 takes about 7 days to climb from first power back to full power. That average is drawn from 15 startups on record, and the most recent took 6 days.
?
Estimated fuel remaining in the current cycle, expressed as a percentage of the unit's typical cycle. Starts at 100% when the unit returns to power post-refuel and drops as full-power-days are burned. Days at reduced power burn fuel proportionally — so a unit with significant downtime (high burn deficit) drops slower and ends up with MORE fuel left than its calendar position would suggest. Coastdown threshold around 15%. Toggle to overlay past cycles on a normalized "days into cycle" axis to see how aggressively this unit historically burns down before refuel.

Fuel Burn Down Cycle since May 16, 2026

94.8% remaining 58 / 679 days 22.5 FPD margin
Fermi 2 is 58 days into its current fuel cycle with an estimated 94.8% of its fuel left. This cycle is set up to run about 679 days. Across its last 16 cycles, it has refueled with an average of 27.3% remaining.
Avg refuel: 27.3% Avg refuel (3yr): 1.1% Deepest burn: 1.1% (2024-05 → 2026-03) Most margin: 40.5% (2012-05 → 2014-02)
?
Monthly capacity factor with outage events overlaid as red bands. Green bars show average power level per month. Toggle to Daily view for raw daily data.

Power History

Over its operating life, Fermi 2 has run at about 83.4% of its rated capacity. Across the last 12 reported months it averaged 73.6%. On the chart, flat stretches near the top are full-power running and drops to zero are outages.
This table logs every recorded outage for Fermi 2, 59 in all since 1999. Of those, 17 were scheduled refueling outages and 42 were unplanned or forced. The typical outage lasted about 21 days. Where the Scheduled column shows (Model), the date is a NukeWorker projection because the utility had not published one.
Scram # 58349
2026-07-04 2026-07-11 8 44d - -
Scram # 58286
2026-05-19 2026-05-21 3 8d - -
Scheduled
2026-03-23 2026-05-11 50 683d 2026-03-21 +2d
Scheduled # 57046
2024-03-23 2024-05-09 48 62d 2024-03-22 +1d
Unscheduled
2024-01-19 2024-01-21 3 134d - -
Unscheduled
2023-08-21 2023-09-07 18 421d - -
Scram # 55964
2022-06-25 2022-06-26 2 48d - -
Scheduled # 55732 SGR/Major
2022-02-05 2022-05-08 93 259d 2022-02-05 0d
Unscheduled
2021-05-17 2021-05-22 6 292d - -
Scheduled SGR/Major
2020-03-21 2020-07-29 131 446d 2020-03-21 0d
Unscheduled
2018-12-07 2018-12-31 25 43d - -
Scheduled
2018-09-22 2018-10-25 34 139d 2018-09-22 0d
Scram # 53336
2018-04-15 2018-05-06 22 362d - -
Scheduled
2017-03-18 2017-04-18 32 127d 2017-03-18 0d
Unscheduled
2016-11-07 2016-11-11 5 179d - -
Unscheduled
2016-05-04 2016-05-12 9 161d - -
Scheduled # 51391
2015-09-14 2015-11-25 73 164d 2015-09-28 -14d
Scram # 50903
2015-03-20 2015-04-03 15 333d - -
Unscheduled
2014-04-16 2014-04-21 6 19d - -
Scheduled
2014-02-11 2014-03-28 46 143d 2014-02-10 +1d
Unscheduled
2013-09-09 2013-09-21 13 123d - -
Unscheduled
2013-04-27 2013-05-09 13 118d - -
Scram # 48487
2012-11-08 2012-12-30 53 51d - -
Scram # 48309
2012-09-15 2012-09-18 4 50d - -
Unscheduled
2012-07-24 2012-07-27 4 2d - -
Scram # 48047
2012-06-26 2012-07-22 27 55d - -
Scheduled
2012-03-26 2012-05-02 38 407d 2012-03-26 0d
Unscheduled
2011-02-12 2011-02-13 2 2d - -
Unscheduled
2011-01-29 2011-02-10 13 59d - -
Scheduled
2010-10-25 2010-12-01 38 133d 2010-10-23 +2d
Unscheduled
2010-06-06 2010-06-14 9 71d - -
Unscheduled
2010-03-26 2010-03-27 2 135d - -
Unscheduled
2009-10-01 2009-11-11 42 109d - -
Unscheduled
2009-06-13 2009-06-14 2 45d - -
Scheduled
2009-03-28 2009-04-29 33 420d 2009-03-28 0d
Unscheduled
2008-02-01 2008-02-02 2 77d - -
Unscheduled
2007-11-15 2007-11-16 2 2d - -
Scheduled
2007-09-29 2007-11-13 46 425d 2007-09-29 0d
Unscheduled
2006-07-30 2006-07-31 2 11d - -
Unscheduled
2006-07-09 2006-07-19 11 22d - -
Unscheduled
2006-06-16 2006-06-17 2 19d - -
Unscheduled
2006-05-20 2006-05-28 9 16d - -
Scheduled
2006-03-26 2006-05-04 40 255d 2006-03-25 +1d
Unscheduled
2005-06-26 2005-07-14 19 141d - -
Unscheduled
2005-01-25 2005-02-05 12 51d - -
Unscheduled Startup Hold
2004-12-05 2004-12-05 1 4d - -
Scheduled
2004-11-06 2004-12-01 26 62d 2004-11-05 +1d
Unscheduled
2004-09-04 2004-09-05 2 18d - -
Unscheduled
2004-08-10 2004-08-17 8 336d - -
Unscheduled
2003-09-06 2003-09-09 4 19d - -
Unscheduled
2003-08-15 2003-08-18 4 100d - -
Scheduled
2003-03-29 2003-05-07 40 87d 2003-03-29 0d
Unscheduled
2002-12-29 2003-01-01 4 86d - -
Unscheduled
2002-10-03 2002-10-04 2 300d - -
Unscheduled
2001-12-06 2001-12-07 2 10d - -
Scheduled
2001-10-29 2001-11-26 29 183d 2001-10-29 0d
Unscheduled
2001-04-28 2001-04-29 2 344d - -
Scheduled
2000-04-02 2000-05-19 48 318d 2000-04-02 0d
Unscheduled
1999-05-19 1999-05-20 2 - - -